Reference projects
Feel free to contact us for more information or to work together on your next successful project - by email or phone call.
Feel free to contact us for more information or to work together on your next successful project - by email or phone call.
Nuremberg, Germany
Aluminum stop log
The Wöhrder See in Nuremberg, once created for flood protection, is now a popular local recreation area. As part of the transformation into the "Water World Wöhrder See", a bathing bay with a sandy beach and protected areas for biodiversity were created. To secure the lake, 14 New, foldable steel supports were installed. They were sealed with light aluminum stop logs from BÜSCH over a total length of around 22.4 m. This protective measure withstands a water pressure of 130 tons and is 3.1 m high.
Important facts:
+ Stop logs made of aluminium
Nuremberg, Germany
Aluminum stop log 22.4 m, water level 3.1 m
The Wöhrder See in Nuremberg, once created for flood protection, is now a popular local recreation area. As part of the transformation into the "Water World Wöhrder See", a bathing bay with a sandy beach and protected areas for biodiversity were created. To secure the lake, 14 New, foldable steel supports were installed. They were sealed with light aluminum stop logs from BÜSCH over a total length of around 22.4 m. This protective measure withstands a water pressure of 130 tons and is 3.1 m high.
Important facts:
+ Stop logs made of aluminium
Gaildorf, Germany
XL4 double-plate penstock
The Gaildorf 2018 natural power storage pilot project is breaking new ground, which requires individualized products - BÜSCH accompanies you from planning and design to production and assembly.
The first BÜSCH delivery could be inspected at the end of 2018 in the already installed condition. A custom-made double-plate penstock (2000 × 5000 mm) with independently moving plates. This is located in an inlet and outlet structure that regulates the water balance of the power plant - once between the lower reservoir and the adjacent river Kocher and also between the lower reservoir and the pump turbines.
Important facts:
+ XL4 double-plate penstock 2000 × 5000 mm
Macedonia
XL3 weir type channel penstock & XL4 penstock
Important facts:
+ 4x XL4 penstock of 1350 × 1100 mm & 1550 × 1800 mm
+ 4x XL3 weir type channel penstock of 2100 × 1500 mm
Macedonia
XL3 weir type channel penstock 2100 x 1500 mm
Important facts:
+ 4x XL4 penstock of 1350 × 1100 mm & 1550 × 1800 mm
+ 4x XL3 weir type channel penstock of 2100 × 1500 mm
Macedonia
XL4 penstock 1550 x 1800 mm
Important facts:
+ 4x XL4 penstock of 1350 × 1100 mm & 1550 × 1800 mm
+ 4x XL3 weir type channel penstock of 2100 × 1500 mm