London, England
Penstocks & channel penstocks
The £635 million Lee Tunnel project in London includes the construction of a nearly seven kilometer long and seven meter wide tunnel, the Lee Tunnel.
Important facts:
+ 149 Penstocks and weir type channel penstocks from 2500 × 3000 mm up to 4150 × 5300 mm and up to 9 mWs
+ 12x Flap cover to 3000 × 3000 mm
+ 25x Overfall weir to 3000 × 305 mm
London, England
Penstocks & channel penstocks
The £635 million Lee Tunnel project in London includes the construction of a nearly seven kilometer long and seven meter wide tunnel, the Lee Tunnel.
Important facts:
+ 149 Penstocks and weir type channel penstocks from 2500 × 3000 mm up to 4150 × 5300 mm and up to 9 mWs
+ 12x Flap cover to 3000 × 3000 mm
+ 25x Overfall weir to 3000 × 305 mm
Prague, Czech Republic
Penstocks
The new wastewater treatment plant is designed for 1.2 million inhabitants and allows the city to comply with EU guidelines.
Important facts:
+ 137 penstocks of different series (CP4, XL4, XL3) & size
+ Rotary weir 3000 × 810 mm
+ 58x Stop logs
+ Dismantling joints made of stainless steel up to a size of 1400 PN 10 for BF3 & 1000 PN for BF4
Prague, Czech Republic
Dismantling joints
The new wastewater treatment plant is designed for 1.2 million inhabitants and allows the city to comply with EU guidelines.
Important facts:
+ 137 penstocks of different series (CP4, XL4, XL3) & size
+ Rotary weir 3000 × 810 mm
+ 58x Stop logs
+ Dismantling joints made of stainless steel up to a size of 1400 PN 10 for BF3 & 1000 PN for BF4
Jaruge, Croatia
XL4 penstock with 13 mWs
One of the largest and most important pilot projects in Croatia in 2017, with the task of combining agricultural irrigation with flood protection, was recently completed. The project, which is 80% financed by the EU, serves on the one hand for irrigation and thus for soil improvement of the so-called BIDJ-BOSUT field with the help of a 14.5-kilometer-long canal and, on the other hand, protection against flooding in the event of high water from the adjacent Sava River.
Important facts:
+ 3x XL4 penstock 3000 × 4500 mm with 13mWs
+ 10x 15 m high stop logs-frames and 4x stop logs sets 3000 × 9000 mm
Jaruge, Croatia
XL4 penstock 3000 × 4500 mm
One of the largest and most important pilot projects in Croatia in 2017, with the task of combining agricultural irrigation with flood protection, was recently completed. The project, which is 80% financed by the EU, serves on the one hand for irrigation and thus for soil improvement of the so-called BIDJ-BOSUT field with the help of a 14.5-kilometer-long canal and, on the other hand, protection against flooding in the event of high water from the adjacent Sava River.
Important facts:
+ 3x XL4 penstock 3000 × 4500 mm with 13mWs
+ 10x 15 m high stop logs-frames and 4x stop logs sets 3000 × 9000 mm
Oberndorf, Austria
XL4 semicircular penstock
The municipality of Oberndorf in Salzburger Land has revised its flood protection concept due to the extreme flooding in June 2013. The location was a particular challenge: three streams flow directly into the Salzach in the local area. A flood overflow tower and a pumping station with screw conveyors form the center of the protection system.
Important facts:
+XL3 weir type channel penstock 3760 × 2450 mm
+XL4 semicircular penstock
+ BEA©Servo electric actuators
Oberndorf, Austria
BEA©Servo electric actuator
The municipality of Oberndorf in Salzburger Land has revised its flood protection concept due to the extreme flooding in June 2013. The location was a particular challenge: three streams flow directly into the Salzach in the local area. A flood overflow tower and a pumping station with screw conveyors form the center of the protection system.
Important facts:
+XL3 weir type channel penstock 3760 × 2450 mm
+XL4 semicircular penstock
+ BEA©Servo electric actuators
Oberndorf, Austria
XL3 weir type channel penstock
The municipality of Oberndorf in Salzburger Land has revised its flood protection concept due to the extreme flooding in June 2013. The location was a particular challenge: three streams flow directly into the Salzach in the local area. A flood overflow tower and a pumping station with screw conveyors form the center of the protection system.
Important facts:
+XL3 weir type channel penstock 3760 × 2450 mm
+XL4 semicircular penstock
+ BEA©Servo electric actuators
Brčko, Bosnia and Herzegovina
XL4 penstock 1400 x 2250 mm
After the extreme floods in May 2014, which caused dozens of deaths and great financial damage in the region, the project of the flood protection structure was pushed ahead by the state with high priority. On January 14th, 2015, the four XL4 penstocks could be installed in a flood protection structure in be installed on site near Brčko by our assembly team.
Important facts:
+ 4x XL4 penstock 1400 × 2250 mm
Czajka, Poland
XL3 channel penstock
Wichtige Fakten:
+8x XL3 channel penstock from 1500 × 1500 to 3100 × 1950 mm
+3x XL4 penstock 2900 × 2900 mm, 2300 × 2300 mm
+19x CP4 penstock 400x 400 bis 1000 × 1950 mm
+8x CP4 weir type penstock 1200 × 1200 mm
Czajka, Poland
XL3 channel penstock 1200 x 1200 mm
Wichtige Fakten:
+8x XL3 channel penstock from 1500 × 1500 to 3100 × 1950 mm
+3x XL4 penstock 2900 × 2900 mm, 2300 × 2300 mm
+19x CP4 penstock 400x 400 bis 1000 × 1950 mm
+8x CP4 weir type penstock 1200 × 1200 mm
Żerań, Poland
XL3 channel penstock 5600 x 3600 mm
The Żerań combined heat and power plant in Warsaw, built in the mid-1950s, is one of the largest combined heat and power plants in Poland and generates both electricity and district heating. In order to be able to continue to operate the longest district heating network in Central Europe reliably in the future, modernization measures are constantly being implemented. Our XL4 penstocks meet an absolute tightness according to EN 12266 and can withstand a pressure of 1.0 bar with a water column of 10 m.
Important facts:
+ 10x XL4 penstock 2400 × 2500 mm with penstock frame
+ integrated 6x Bar screen
+ 4x XL3 channel penstock 5600 × 3600 mm
+ 16x BEA©servo electric actuators - custom designed
+ 3x Stop logs
Żerań, Poland
BEA©servo electric actuators
The Żerań combined heat and power plant in Warsaw, built in the mid-1950s, is one of the largest combined heat and power plants in Poland and generates both electricity and district heating. In order to be able to continue to operate the longest district heating network in Central Europe reliably in the future, modernization measures are constantly being implemented. Our XL4 penstocks meet an absolute tightness according to EN 12266 and can withstand a pressure of 1.0 bar with a water column of 10 m.
Important facts:
+ 10x XL4 penstock 2400 × 2500 mm with penstock frame
+ integrated 6x Bar screen
+ 4x XL3 channel penstock 5600 × 3600 mm
+ 16x BEA©servo electric actuators - custom designed
+ 3x Stop logs
Żerań, Poland
XL4 penstock mit BEA©servo electric actuators
The Żerań combined heat and power plant in Warsaw, built in the mid-1950s, is one of the largest combined heat and power plants in Poland and generates both electricity and district heating. In order to be able to continue to operate the longest district heating network in Central Europe reliably in the future, modernization measures are constantly being implemented. Our XL4 penstocks meet an absolute tightness according to EN 12266 and can withstand a pressure of 1.0 bar with a water column of 10 m.
Important facts:
+ 10x XL4 penstock 2400 × 2500 mm with penstock frame
+ integrated 6x Bar screen
+ 4x XL3 channel penstock 5600 × 3600 mm
+ 16x BEA©servo electric actuators - custom designed
+ 3x Stop logs