Reference projects
Feel free to contact us for more information or to work together on your next successful project - by email or phone call.
Feel free to contact us for more information or to work together on your next successful project - by email or phone call.
St. Augustin, Germany
XL3 channel penstock
Wichtige Fakten:
+ 4x XL3 channel penstock - 2100 × 2000 mm, 2600 × 2000 mm, 3180 × 2000 mm
+ XL3 semicircular channel penstock - 3340 × 2450 mm
Ringsend, Irland
XL4 penstock 2400 x 2300 mm
Wichtige Fakten:
+ 2x XL4 penstock - 2400 × 2300 mm with continuous solid material shaft between penstock plate and bracket headstock, with integrated threads
Warsaw, Poland
XL4 semicircular penstock
Important facts:
+ 2x XL4 Penstock - 2300 × 1100 mm
+ 3x XL4 semicircular penstock - 1600 × 1600 mm & 2000 × 2000 mm
+ 4x XL3 weir type channel penstock - 1800 × 2750 mm
Warsaw, Poland
XL4 Penstock & XL3 weir type channel penstock
Important facts:
+ 2x XL4 Penstock - 2300 × 1100 mm
+ 3x XL4 semicircular penstock - 1600 × 1600 mm & 2000 × 2000 mm
+ 4x XL3 weir type channel penstock - 1800 × 2750 mm
Portugal
XL3 channel penstock & penstock
On behalf of Veolia, BÜSCH supplied the new sewage treatment plant for Celulose Beira Industrial (Celbi) S.A. on the west coast of Portugal.
The manufacturer of pulp, especially from eucalyptus, mechanical pulp and paper, attaches great importance to sustainability and produces the energy for its plants by using plant waste products from its own production.
Important facts:
+ 4x XL3 channel penstocks including gears
+ 9x XL4 penstock with rising spindle
Portugal
XL3 channel pentstocks including gears
On behalf of Veolia, BÜSCH supplied the new sewage treatment plant for Celulose Beira Industrial (Celbi) S.A. on the west coast of Portugal.
The manufacturer of pulp, especially from eucalyptus, mechanical pulp and paper, attaches great importance to sustainability and produces the energy for its plants by using plant waste products from its own production.
Important facts:
+ 4x XL3 channel penstocks including gears
+ 9x XL4 penstock with rising spindle
Portugal
XL4 channel penstock with rising spindle
On behalf of Veolia, BÜSCH supplied the new sewage treatment plant for Celulose Beira Industrial (Celbi) S.A. on the west coast of Portugal.
The manufacturer of pulp, especially from eucalyptus, mechanical pulp and paper, attaches great importance to sustainability and produces the energy for its plants by using plant waste products from its own production.
Important facts:
+ 4x XL3 channel penstocks including gears
+ 9x XL4 penstock with rising spindle
Berlin, Germany
2x 2000 x 3000 mm XL4 penstock
"Berliner Wasserbetriebe" has been expanding its wastewater treatment plant in Waßmannsdorf since 2017. This extensive project had high requirements and specifications with a tight schedule.
Important facts:
+ 71 Penstock with stem pipe (XL3, XL4, SAFOX©)
+ wide: 250 × 250 - 2x 2000 × 3000 mm
+ with SENTINEL position indicators & automatic spindle lubrication
+ 20 Rotary weir
Dammsysteme:
+ 30 Dam systems, consisting of 357 single stop logs
+ wide: 1100 - 3100 mm with a damming height of 1571 - 4575 mm
Berlin, Germany
Channel penstockswith actuators
"Berliner Wasserbetriebe" has been expanding its wastewater treatment plant in Waßmannsdorf since 2017. This extensive project had high requirements and specifications with a tight schedule.
Important facts:
+ 71 Penstock with stem pipe (XL3, XL4, SAFOX©)
+ wide: 250 × 250 - 2x 2000 × 3000 mm
+ with SENTINEL position indicators & automatic spindle lubrication
+ 20 Rotary weir
Dammsysteme:
+ 30 Dam systems, consisting of 357 single stop logs
+ wide: 1100 - 3100 mm with a damming height of 1571 - 4575 mm
Berlin, Germany
Penstock with push-pull rod
"Berliner Wasserbetriebe" has been expanding its wastewater treatment plant in Waßmannsdorf since 2017. This extensive project had high requirements and specifications with a tight schedule.
Important facts:
+ 71 Penstock with stem pipe (XL3, XL4, SAFOX©)
+ wide: 250 × 250 - 2x 2000 × 3000 mm
+ with SENTINEL position indicators & automatic spindle lubrication
+ 20 Rotary weir
Dammsysteme:
+ 30 Dam systems, consisting of 357 single stop logs
+ wide: 1100 - 3100 mm with a damming height of 1571 - 4575 mm
Berlin, Deutschland
Penstock with hand wheel
"Berliner Wasserbetriebe" has been expanding its wastewater treatment plant in Waßmannsdorf since 2017. This extensive project had high requirements and specifications with a tight schedule.
Important facts:
+ 71 Penstock with stem pipe (XL3, XL4, SAFOX©)
+ wide: 250 × 250 - 2x 2000 × 3000 mm
+ with SENTINEL position indicators & automatic spindle lubrication
+ 20 Rotary weir
Dammsysteme:
+ 30 Dam systems, consisting of 357 single stop logs
+ wide: 1100 - 3100 mm with a damming height of 1571 - 4575 mm
Berlin, Deutschland
Rotary weir
"Berliner Wasserbetriebe" has been expanding its wastewater treatment plant in Waßmannsdorf since 2017. This extensive project had high requirements and specifications with a tight schedule.
Important facts:
+ 71 Penstock with stem pipe (XL3, XL4, SAFOX©)
+ wide: 250 × 250 - 2x 2000 × 3000 mm
+ with SENTINEL position indicators & automatic spindle lubrication
+ 20 Rotary weir
Dammsysteme:
+ 30 Dam systems, consisting of 357 single stop logs
+ wide: 1100 - 3100 mm with a damming height of 1571 - 4575 mm
Tampere, Finland
XL3 channel penstock & weir type channel penstock
Since 2019, Tampere has been remodeling its sewage treatment plant. For the first construction phase, BÜSCH has delivered XL4 penstocks and XL3 channel penstocks. The next delivery will be with stop logs in autumn 2023.
Important facts:
+ 2x XL4 penstock of 1600 × 1000 mm
+30x XL3 channel penstock and XL3 weir type channel penstock of 600 × 1500 mm to 2450 × 1800 mm
+ 32x Housings for penstocks
+Stop logs of 1350 × 2000 mm to 6850 × 1125 mm
Tampere, Finland
XL3 channel penstock & weir type penstock
Since 2019, Tampere has been remodeling its sewage treatment plant. For the first construction phase, BÜSCH has delivered XL4 penstocks and XL3 channel penstocks. The next delivery will be with stop logs in autumn 2023.
Important facts:
+ 2x XL4 penstock of 1600 × 1000 mm
+30x XL3 channel penstock and XL3 weir type channel penstock of 600 × 1500 mm to 2450 × 1800 mm
+ 32x Housings for penstocks
+Stop logs of 1350 × 2000 mm to 6850 × 1125 mm
Keadby, England
XL4 penstock
Important facts:
+ XL4 penstock 1700 × 1900 mm with 8 mWs
Keadby, England
XL4 penstock
Important facts:
+ XL4 penstock 1700 × 1900 mm with 8 mWs
Prague, Czech Republic
XL3 channel penstock 2400 x 3500 mm
Important facts:
+ 18x XL3 channel penstocks 2400 × 3500 mm and 1200 × 2000 mm